Commercial and industrial electrical construction

Division 26 self-performed by an unlimited-licensed North Carolina contractor — heavy conduit, power distribution, switchgear and lighting, in new construction and in facilities that cannot go dark.

Parallel conduit racks feeding panelboards and a dry-type transformer in an industrial electrical room
Feeder conduit racks, transformer and panelboards — new construction
E-11
Scope

What we self-perform

The work most electrical subcontractors farm out, we carry on our own crews and our own schedule.

Div 26

Heavy Conduit & Raceway

EMT and rigid conduit routing, MC cable pulling, cable tray and raceway for new construction and remodel.

Div 26

Power Distribution

High-capacity panel replacements, service upgrades, feeders and commercial switchgear installation.

Div 26

Switchgear & Cutovers

Phased cutovers planned around production and business hours, so critical loads stay energised.

Div 26

Commercial Lighting

Lighting design, LED retrofits and one-for-one troffer replacement, including high-bay work in warehouse space.

Div 26

Machinery & Equipment

Industrial machinery power connections, HVLS fans, HVAC disconnects and equipment terminations.

Div 27

Communications

Structured cabling, fiber and low-voltage carried on the same subcontract. See Division 27.

Compliance

Code Compliance & Inspection

Inspections that surface violations before the AHJ does, with a written punch list and corrections priced up front.

Service

Emergency Response

Outages, electrical hazards and equipment failures prioritised to minimise downtime.

Occupied Facilities

Work that happens around your operations

Retail, office, restaurant and industrial facilities — new construction or a remodel in a building that never closes.

Most of our commercial work happens in buildings that are still running. A production line, a bank lobby, a warehouse mid-shift — the electrical scope has to fit around the operation rather than the other way round.

That changes how a job is planned. Cutovers get sequenced against the facility calendar, temporary power is staged before anything comes down, and the crew works to a shutdown window that was agreed before mobilisation, not negotiated on the day.

Facility types we work in

  • Manufacturing and production facilities
  • Warehouse and distribution space
  • Offices and commercial tenant upfits
  • Retail and restaurant build-outs
  • Financial and institutional facilities
Savant electrician on a ladder installing track lighting at the Greater Fayetteville Chamber's new office
Track lighting installation — Greater Fayetteville Chamber, occupied facility
E-12
Bid Process

From drawings to a real number

01

Send drawings

Email plans, specs and addenda to [email protected], or use the bid request form. Bid dates noted up front.

02

Reviewed by the licensee

Your drawings are taken off by the licensed contractor who will run the job — not a call centre or an estimating service.

03

One subcontract

Division 26 and Division 27 quoted together, so the low-voltage scope is not a gap in your buyout.

04

Prequal on file

License, insurance certificates and classifications supplied in the format your sub file needs.

Large commercial distribution panelboard with main breaker and an arc-flash hazard warning label
Distribution panelboard — arc-flash labeled
Open 480-volt three-phase panelboard with breakers feeding industrial fans
480V 3-phase panelboard — fan feeders
Newly installed LED tube fixtures in the suspended ceiling grid of a commercial space
LED tube retrofit in an occupied tenant space
E-13
Prequalification

Everything your sub file needs

License, coverage and classifications — verifiable, and formatted the way your prequal packet asks for them.

License
NC Unlimited Electrical
#U.36332
No project value limit
General Liability
$2,000,000 / $4,000,000
Per occurrence / aggregate
Auto & Workers’ Comp
$1,000,000 / $1,000,000
Commercial auto · statutory WC
Safety
OSHA 30 + OSHA 10
Both active
Classifications
CSI DIV 26 + 27
NAICS 238210
Electrical · Communications
Coverage
STATEWIDE — NC
Based in Raeford · Sandhills, Triangle, Charlotte Metro
Independently verified SafeHire NC checks our license status against the NC Board of Examiners of Electrical Contractors, our corporate registration against the NC Secretary of State, our workers' compensation coverage against NCIC records, and our OSHA violation history — and publishes the result. SafeHire NC is an independent service and is not affiliated with the State of North Carolina.
Download Capabilities Statement (PDF)
Common Questions

Working with us as a subcontractor

Do you work as a subcontractor to general contractors?

Yes — that is the core of the business. We hold a North Carolina Unlimited Electrical License, carry $2M/$4M general liability, and supply certificates and classifications in whatever format your prequalification process requires.

What does an unlimited license mean for my project?

A North Carolina Unlimited Electrical License carries no cap on project value. There is no threshold at which we stop being eligible, and nothing for your prequalification team to work around.

Can Division 26 and Division 27 go on one subcontract?

Yes, and we would prefer it. We self-perform both, so the data rough-in is sequenced against the branch circuits by the same foreman. It removes a vendor from your buyout and a coordination meeting from your schedule.

What do you need in order to price a job?